Pre-removal Operation
  • Under Cover Removal (Refer to GROUP 51, Under Cover ).
  • Drive Belt Removal (Refer to GROUP 11E, Crankshaft Pulley ).
Post-installation Operation
  • Drive Belt Installation (Refer to GROUP 11E, Crankshaft Pulley ).
  • Drive Belt Tension Check (Refer to GROUP 11E, On-vehicle Service ).
  • Under Cover Installation (Refer to GROUP 51, Under Cover ).

   



Removal steps


1.
A/C compressor assembly connector


2.
A/C compressor assembly connector clamp


3.
Alternator connector


4.
Alternator terminal


5.
Connector bracket


6.
Harness bracket
<<A>>

7.
Alternator assembly



Timing belt lower cover (Refer to GROUP 11E, Timing Belt ).


8.
Alternator mounting bracket

REMOVAL SERVICE POINT
©2004 Mitsubishi Motors Corporation