<4G63, 4G64, 4G69 EXCEPT FOR BRAZIL AND CHILE>
Pre-removal and Post-installation Operation
  • Air Cleaner Cover and Air Intake Hose Removal and Installation (Refer to GROUP 15 - Air Cleaner <4G63-SOHC, 4G64-SOHC>, <4G69>).
  • Battery and Battery Tray Removal and Installation. <4G63-DOHC>

   



Removal steps


1.
Purge hose connection


2.
Vapour hose


3.
Vent connector


4.
Vapour hose


5.
Hose clamp


6.
Canister


7.
Fuel high-pressure hose clamp


8.
Canister bracket

<4G69 VEHICLES FOR BRAZIL AND CHILE>
   



Removal steps


1.
Vent hose A


2.
Vent hose B


3.
Vent hose C


4.
Vent pipe assembly


5.
Evaporative emission ventilation solenoid valve connector


6.
Onboard refuelling vapour recover (ORVR) vent valve module


7.
Evaporative emission ventilation solenoid valve


8.
Purge hose B


9.
Vapour hose


10.
Canister and canister bracket assembly


11
Canister


12
Canister bracket

©2004 Mitsubishi Motors Corporation