INJECTOR
Pre-removal Operation
  • Fuel Discharge Prevention (Refer to ).
  • Intercooler Assembly and Intercooler Outlet Air Hose Removal <4G63-DOHC> (Refer to GROUP 15, Intercooler ).
  • Accelerator Cable Removal (Refer to GROUP 17, Accelerator Cable and Pedal ).
Post-installation Operation
  • Accelerator Cable Installation (Refer to GROUP 17, Accelerator Cable and Pedal ).
  • Accelerator Cable Adjustment (Refer to GROUP 17,On-vehicle Service - Accelerator Cable Adjustment ).
  • Intercooler Assembly and Intercooler Outlet Air Hose Installation <4G63-DOHC> (Refer to GROUP 15, Intercooler ).
  • Fuel Leakage Inspection.

       



REMOVAL STEPS


1.
PCV hose connection


2.
Injector connector


3.
Purge control solenoid valve connector


4.
EGR solenoid valve connector


5.
Emission control equipment hose connector


6.
O-ring

>>A<<
7.
Fuel high-pressure hose connection


8.
Fuel return hose connection


9.
O-ring

>>A<<
10.
Delivery pipe pressure regulator
<<A>>

11.
Fuel delivery pipe and fuel injector assembly


12.
Insulators

>>A<<
13.
Fuel injector assembly


14.
O-ring


15.
Fuel injector sheets


16.
Fuel injectors


17.
Insulators


18.
Fuel delivery pipe

REMOVAL SERVICE POINT
INSTALLATION SERVICE POINT
©2004 Mitsubishi Motors Corporation