Pre-removal Operation
- Engine Coolant Draining (Refer to GROUP 14, On-vehicle Service -
Engine Coolant Replacement
).
- Intercooler Assembly and Intercooler Outlet Air Hose Removal <4G63-DOHC>
(Refer to GROUP 15, Intercooler
).
- Air Cleaner Removal (Refer to GROUP 15, Air Cleaner
<4G63-SOHC, 4G64-SOHC>, <4G63-DOHC>).
|
Post-installation Operation
- Air Cleaner Installation (Refer to GROUP 15, Air Cleaner
<4G63-SOHC, 4G64-SOHC>, <4G63-DOHC>).
- Engine Coolant Supplying (Refer to GROUP 14, On-vehicle Service -
Engine Coolant Replacement
).
- Accelerator Cable Adjustment (Refer to GROUP 17, On-vehicle Service -
Accelerator Cable Adjustment
).
- Intercooler Assembly and Intercooler Outlet Air Hose Installation <4G63-DOHC>
(Refer to GROUP 15, Intercooler
).
|