THROTTLE BODY ASSEMBLY
Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14, On-vehicle Service - Engine Coolant Replacement ).
  • Air Cleaner Removal (Refer to GROUP 15, Air Cleaner <4G63-SOHC, 4G64-SOHC> ).
Post-installation Operation
  • Air Cleaner Installation (Refer to GROUP 15, Air Cleaner <4G63-SOHC, 4G64-SOHC> ).
  • Engine Coolant Supplying (Refer to GROUP 14, On-vehicle Service - Engine Coolant Replacement ).
  • Accelerator Cable Adjustment (Refer to GROUP 17, On-vehicle Service - Accelerator Cable Adjustment ).

   



REMOVAL STEPS


1.
Accelerator cable connection


2.
Throttle position sensor connector


3.
Idle speed control servo connector


4.
Emission vacuum hose connection


5.
Water feed hose connection


6.
Water return hose connection


7.
Throttle body assembly

>>A<<
8.
Throttle body gasket

INSTALLATION SERVICE POINT
   
Install the throttle body gasket as shown in the illustration.
©2004 Mitsubishi Motors Corporation