INLET MANIFOLD
Pre-removal Operation
  • Throttle Body Removal (Refer to GROUP 13A, Throttle Body ).
Post-installation Operation
  • Throttle Body Installation (Refer to GROUP 13A, Throttle Body ).
  • Accelerator Cable Adjustment (Refer to GROUP 17, On-vehicle Service - Accelerator Cable Check and Adjustment ).

   



Removal steps


1.
Manifold absolute pressure sensor connector


2.
EGR control solenoid valve connector


3.
Purge control solenoid valve connector


4.
Detonation sensor connector


5.
Injector connectors


6.
Ignition coil connectors


7.
Engine coolant temperature gauge unit connector


8.
Accelerator cable connection


9.
Manifold absolute pressure sensor


10.
Brake booster vacuum hose connection


11.
Earth cable connection


12.
Oil level gauge and guide


13.
O-ring

   



Removal steps


14.
EGR valve


15.
EGR valve gasket


16.
PCV hose


17.
Fuel return line hose connection


18.
Emission control equipment hose connector


19.
Fuel delivery pipe and fuel injector assembly


20.
Vacuum pipe assembly


21.
Solenoid valve assembly


22.
Intake manifold stay
<<A>>
>>B<<
23.
Radiator lower hose connection


24.
Water feed hose connection


25.
Heater water hoses connection
<<B>>
>>A<<
26.
Thermostat case assembly


27.
Intake manifold assembly


28.
Intake manifold gasket

REMOVAL SERVICE POINTS
   
Make mating marks on the radiator hose and the hose clamp. Disconnect the radiator hose.
   
Loosen the water inlet pipe mounting bolts and remove the thermostat case assembly.
INSTALLATION SERVICE POINTS
   
  1. Insert each hose as far as the projection of the water inlet fitting.
  1. Align the mating marks on the radiator hose and hose clamp, and then connect the radiator hose.
©2004 Mitsubishi Motors Corporation