ENGINE MOUNTING
<DOHC>
 CAUTION
*: Indicates parts which should be initially tightened, and then fully tightened after placing the vehicle horizontally and loading the full weight of the engine on the vehicle body.
Pre-removal Operation
  • Raise the engine and transmission assembly until its weight is not applied to the insulator, and support it securely.
  • Reserve Tank Removal (Refer to GROUP 14, Radiator ).
Post-installation Operation
Reserve Tank Installation (Refer to GROUP 14, Radiator ).

   



Removal steps


1.
Pressure hose clamp


2.
Self-locking nut


3.
Engine mounting adapter

>>A<<
4.
Engine mounting stopper


5.
Engine mounting

INSTALLATION SERVICE POINT
   
Install the engine mounting stopper so that its arrow faces towards the engine.
©2004 Mitsubishi Motors Corporation