1. Close the high and low-pressure valve of the gauge manifold.
  1. Connect the charging hose (blue) to the low-pressure valve and connect the charging hose (red) to the high-pressure valve of the gauge manifold.
  1. Install the quick joint (for low-pressure) to the charging hose (blue), and connect the quick joint (for high-pressure) to the charging hose (red).
 CAUTION
  • To connect the quick joint, press section A firmly against the service valve until a click is heard.
  • When connecting, run your hand along the hose while pressing to ensure that there are no bends in the hose.
NOTE: The high-pressure service valve is on the A/C pipe and the low-pressure service valve is on the suction hose.
  1. Connect the quick joint (for low-pressure) to the low-pressure service valve and connect the quick joint (for high-pressure) to the high-pressure service valve.
  1. Start the engine.
  1. Set the A/C controls as follows:
    • A/C switch: A/C - ON position
    • Mode selection: FACE position
    • Temperature control: MAXIMUM COOLING position
    • Air selection: RECIRCULATION position
    • Blower switch: "4" (Fast) position
  1. Adjust engine speed to 1,500 r/min with A/C clutch engaged.
  1. Engine should be warmed up with doors and windows opened.
       
    1. Insert a thermometer in the centre air outlet and operate the engine for 20 minutes.
    NOTE: If the clutch cycles, take the reading before the clutch disengages.
    1. Note the discharge air temperature.
    Performance Temperature Chart
    Garage ambient temperature °C
    20
    25
    30
    35
    Discharge air temperature °C
    8.0 - 11.0
    12.0 - 16.0
    17.0 - 21.0
    22.5 - 27.5
    Compressor high pressure kPa
    740 - 840
    950 - 1,050
    1,160 - 1,300
    1,360 - 1,550
    Compressor low pressure kPa
    150 - 190
    190 - 240
    240 - 300
    300 - 375

    ©2004 Mitsubishi Motors Corporation