|
|
|
|
|
Cooling temperature switch disassembly steps
|
|
|
1.
|
Snap ring
|
|
|
2.
|
Cooling temperature switch
|
|
|
3.
|
O ring
|
|
|
|
Magnetic clutch disassembly
|
|
>>D<<
|
•
|
Air gap adjustment
|
<<A>>
|
>>C<<
|
4.
|
Self-locking nut
|
|
|
5.
|
Armature
|
|
>>B<<
|
6.
|
Snap ring
|
|
|
7.
|
Rotor
|
|
|
8.
|
Snap ring
|
|
>>A<<
|
9.
|
Field core
|
|
|
10.
|
Shim
|
|
|
11.
|
A/C compressor
|
|
| DISASSEMBLY SERVICE POINT
|
| <<A>>
SELF-LOCKING NUT REMOVAL
|
|
Use the special tool to remove the self-locking nut.
- Special spanner (MB991367)
|
| |
| >>A<<
FIELD CORE ATTACHMENT
|
|
Line up the pin hole on the compressor unit with the field core projection and attach.
|
| >>B<<
SNAP RING INSTALLATION
|
|
Using snap ring pliers, fit the snap ring so that the snap ring’s tapered part is on the outside.
|
| >>C<<
SELF-LOCKING NUT INSTALLATION
|
|
Use the special tool to install the self-locking nut.
- Special spanner (MB991367)
|
| |
|
Apply voltage from the battery to the magnetic clutch and check that the clutch air gap is inside the standard value. If outside the standard value, use a shim to adjust the gap.
Standard value: 0.3 -
0.5 mm
|