ANTENNA
Pre-removal and Post-installation Operation
  • Front pillar trim, Quarter trim upper, Quarter trim lower, Centre pillar trim lower, Centre pillar trim upper (Refer to GROUP 52A, Trim .)
  • Assist Grip, Headlining (Refer to GROUP 52A, Headlining .)
  • Instrument Panel Removal and Installation (Refer to GROUP 52A, Instrument Panel Assembly <L.H. drive vehicles> or <R.H. drive vehicles>.)

   



Removal steps


1.
Rod assembly


2.
Antenna nut


3.
Base


4.
Antenna feeder assembly

©2004 Mitsubishi Motors Corporation